Information Collection Request

FERC-914, Cogeneration and Small Power Production - Tariff Filings

ICR 202603-1902-004 · OMB 1902-0231 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
FERC-914 supporting statement 2026.docx Supporting Statement A Uploaded 2026-04-16 Available
FERC-547-550-914 Renewal - 30 day FRN Published 2026.pdf Supplementary Document Uploaded 2026-04-14 Available
20260409-3059_FY 2026 - 30 Day Notice 550_547_914.docx Supplementary Document Uploaded 2026-04-14 Available
FERC-547-550-914 Renewal - 60 day FRN Published 2026.pdf Supplementary Document Uploaded 2026-04-14 Available
20260120-3011_Final_60 Day Notice 550_547_914.docx Supplementary Document Uploaded 2026-04-14 Available
16 USC 2601.pdf Supplementary Document Uploaded 2019-06-27 Available
16 USC 824(f).pdf Supplementary Document Uploaded 2019-06-27 Available
16 USC 824(e).pdf Supplementary Document Uploaded 2019-06-27 Available
16 USC 824(d).pdf Supplementary Document Uploaded 2019-06-27 Available
18 CFR Part 292 (up to date as of 4-14-2026).pdf Supplementary Document Uploaded 2026-04-16 Available
18 CFR Part 35 (up to date as of 4-14-2026).pdf Supplementary Document Uploaded 2026-04-16 Available
ICR Details
1902-0231 202603-1902-004
Received in OIRA 202206-1902-010
FERC FERC-914
FERC-914, Cogeneration and Small Power Production - Tariff Filings
Extension without change of a currently approved collection   No
Regular 04/16/2026
  Requested Previously Approved
36 Months From Approved 07/31/2026
190 190
8,270 8,270
0 0

Section 1253 of the Energy Policy Act of 2005 (EPAct 2005) modified Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The Commission implemented the Congressional mandate of the EPAct 2005 by, inter alia, establishing criteria for new qualifying cogeneration facilities by: • ensuring that these facilities are using their thermal output in a productive and beneficial manner; that the electrical, thermal, chemical and mechanical output of new qualifying cogeneration facilities is used fundamentally for industrial, commercial, residential or industrial purposes; and there is continuing progress in the development of efficient electric energy generating technology; • amending the FERC Form No. 556 (OMB Control No. 1902-0075) to reflect the criteria for new qualifying cogeneration facilities; and • eliminating ownership limitations for qualifying cogeneration and small power production facilities. The Commission satisfied the statutory mandate and its continuing obligation to review its policies encouraging cogeneration and small power production, energy conservation, efficient use of facilities and resources by electric utilities and equitable rates for energy customers. In the FERC-914 collection, those qualifying cogeneration and small power production facilities, required to do so, will submit to FERC: • FPA Section 205 and/or 206 filings, • Change of status notifications. Section 205 filings refer to Section 205(c) of the Federal Power Act (FPA), which requires that every public utility have all of its jurisdictional rates and tariffs on file with the Commission and make them available for public inspection, within such time and in such form as the Commission may designate. Section 205(d) of the FPA requires that every public utility must provide notice to the Commission and the public of any changes to its jurisdictional rates and tariffs. In addition, FPA section 206 allows the Commission, upon complaint or its own motion, to modify existing rates or services that the Commission finds to be unjust, unreasonable, unduly discriminatory or preferential.

US Code: 16 USC 2601 Name of Law: Public Utility Regulatory Policies Act of 1978 (PURPA)
   US Code: 16 USC 824d-f Name of Law: Federal Power Act (FPA)
   PL: Pub.L. 109 - 58 1253(a), (b) Name of Law: Energy Policy Act of 2005 (EPAct 2005)
  
None

Not associated with rulemaking

  91 FR 3168 01/26/2026
91 FR 19125 04/14/2026
No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 190 190 0 0 0 0
Annual Time Burden (Hours) 8,270 8,270 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$350,527
No
    No
    No
No
No
No
No
Nishi Parekh 202 502-8325

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/16/2026