Information Collection Request

NSPS for Stationary Gas Turbines (40 CFR Part 60, Subpart GG) (Renewal)

ICR 202508-2060-002 · OMB 2060-0028 · Active

Forms and Documents
DocumentTypeStatusAvailability
1071fr16.docx Supplementary Document Uploaded 2025-09-30 Available
1071fr16.docx Supplementary Document Uploaded 2025-09-30 Repair queued
1071.16_Regulatory Text.docx Supplementary Document Uploaded 2025-09-16 Available
1071.16_Regulatory Text.docx Supplementary Document Uploaded 2025-09-16 Missing upstream
1071t16.xlsx Supplementary Document Uploaded 2025-08-22 Available
1071t16.xlsx Supplementary Document Uploaded 2025-08-22 Missing upstream
1071ss16.docx Supporting Statement A Uploaded 2025-08-22 Available
1071ss16.docx Supporting Statement A Uploaded 2025-08-22 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
24056 NSPS for Stationary Gas Turbines (40 CFR Part 60, Subpart GG) (Renewal) Other-Systems Screenshots Modified
ICR Details
2060-0028 202508-2060-002
Active 202409-2060-001
EPA/OAR 1071.16
NSPS for Stationary Gas Turbines (40 CFR Part 60, Subpart GG) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/15/2025
Retrieve Notice of Action (NOA) 09/30/2025
In accordance with 5 CFR 1320, this information collection is approved.
  Inventory as of this Action Requested Previously Approved
12/31/2028 36 Months From Approved 12/31/2025
1,070 0 1,070
69,100 0 69,100
0 0 0

The New Source Performance Standards (NSPS) for Stationary Gas Turbines (40 CFR Part 60, Subpart GG) were promulgated on September 10, 1979; and last-amended on February 27, 2014. These regulations apply to both existing facilities and new facilities that have stationary gas turbines with a heat input at peak load equal or greater than 10.7 gigajoules per hour (based on the lower heating value of the fuel fired). There are no new facilities under this subpart, as any facility which commenced either construction, or modification, or reconstruction after February 18, 2005 is subject to the NSPS for Stationary Combustion Turbines (40 CFR Part 60, Subpart KKKK). This information is being collected to assure compliance with 40 CFR Part 60, Subpart GG. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  90 FR 25614 06/17/2025
90 FR 46197 09/25/2025
Yes

1
IC Title Form No. Form Name
NSPS for Stationary Gas Turbines (40 CFR Part 60, Subpart GG) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1,070 1,070 0 0 0 0
Annual Time Burden (Hours) 69,100 69,100 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$279,000
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/30/2025