Information Collection Request

FERC-505, Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determination

ICR 202508-1902-002 · OMB 1902-0115 · Active

Forms and Documents
DocumentTypeStatusAvailability
FERC 500-505 30-Day FRN 2025 Published.pdf Supplementary Document Uploaded 2025-09-26 Repair queued
FERC 500-505 30-Day FRN 2025 Published.pdf Supplementary Document Uploaded 2025-09-26 Repair queued
FERC-500 and FERC-505 supporting statement 2025.docx Supporting Statement A Uploaded 2025-09-26 Repair queued
FERC-500 and FERC-505 supporting statement 2025.docx Supporting Statement A Uploaded 2025-09-26 Repair queued
20250923-3063_FERC-500 and FERC-505 30-day FRN.docx Supplementary Document Uploaded 2025-09-25 Available
20250923-3063_FERC-500 and FERC-505 30-day FRN.docx Supplementary Document Uploaded 2025-09-25 Missing upstream
FERC 500-505 60-Day FRN 2025 Published.pdf Supplementary Document Uploaded 2025-09-25 Available
FERC 500-505 60-Day FRN 2025 Published.pdf Supplementary Document Uploaded 2025-09-25 Repair queued
20250717-3000_FERC-500 and 505 60-day notice - 2025 Renewal (1).docx Supplementary Document Uploaded 2025-09-25 Available
20250717-3000_FERC-500 and 505 60-day notice - 2025 Renewal (1).docx Supplementary Document Uploaded 2025-09-25 Repair queued
18 CFR Part 7.pdf Supplementary Document Uploaded 2021-08-05 Repair queued
18 CFR Part 7.pdf Supplementary Document Uploaded 2021-08-05 Missing upstream
18 CFR Part 5.pdf Supplementary Document Uploaded 2021-07-15 Available
18 CFR Part 5.pdf Supplementary Document Uploaded 2021-07-15 Repair queued
18 CFR Part 4.pdf Supplementary Document Uploaded 2021-07-15 Available
18 CFR Part 4.pdf Supplementary Document Uploaded 2021-07-15 Missing upstream
16 U.S.C. 2705.docx Supplementary Document Uploaded 2021-07-15 Repair queued
16 U.S.C. 2705.docx Supplementary Document Uploaded 2021-07-15 Missing upstream
Federal Power Act Part I.docx Supplementary Document Uploaded 2021-07-15 Repair queued
Federal Power Act Part I.docx Supplementary Document Uploaded 2021-07-15 Missing upstream
ICR Details
1902-0115 202508-1902-002
Active 202502-1902-003
FERC FERC-505
FERC-505, Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determination
Extension without change of a currently approved collection   No
Regular
Approved without change 02/15/2026
Retrieve Notice of Action (NOA) 09/26/2025
In accordance with 5 CFR 1320, the information collection is approved.
  Inventory as of this Action Requested Previously Approved
02/28/2029 36 Months From Approved 02/28/2026
319 0 324
23,638 0 24,555
0 0 0

FERC-505 includes applications, notices of intent, and related information collection activities for: • Small hydropower project licenses and relicenses; • Exemptions; and • Determinations of a qualifying conduit hydropower facility. Small hydropower projects are minor water power projects and major water power projects that have an installed capacity of 10 MW or less. They may be licensed under Part I of the Federal Power Act, but some small hydropower projects may be eligible for an exemption. There are two types of FERC hydropower exemptions: (1) exemptions for qualifying conduit hydropower facilities; and (2) exemptions for small projects of 10 MW or less. A qualifying conduit hydropower facility, as defined in section 30 of the FPA, is an existing or proposed hydroelectric facility that utilizes for electric power generation the hydroelectric potential of a conduit, or any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is not primarily used for the generation of electricity. A Notice of Intent to Construct Qualifying Conduit Hydropower Facilities under 18 CFR 4.401, which is discussed above, is required in order to seek a determination by the Commission that the proposed facility is in accordance with criteria listed at section 30 of the FPA. If the Commission issues such a determination, the facility is not required to be licensed or exempted by the Commission under Part I of the FPA. A 10-MW exemption, as defined in section 405(d) of PURPA, is a project that utilizes for electric generation the water potential of either an existing non-federal dam or a natural water feature (e.g., natural lake, water fall, gradient of a stream, etc.) without the need for a dam or man-made impoundment. The respondents for this information collection include citizens of the United States, corporations organized under the laws of United States or any State thereof, State governments, and municipalities.

US Code: 16 USC 791 Name of Law: Federal Power Act
  
None

Not associated with rulemaking

  90 FR 34648 07/23/2025
90 FR 46401 09/26/2025
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 319 324 0 0 -5 0
Annual Time Burden (Hours) 23,638 24,555 0 0 -917 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
Adjustments in Estimates. The changes described in the table below are due to normal fluctuations in the industry (e.g., companies merging, splitting, entering into, and exiting the industry).  There are no program changes or changes to the reporting or recordkeeping requirements.

$1,827,769
No
    No
    No
No
No
No
No
Ken Ambrose 202 502-8524 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/26/2025