Information Collection Request

FERC-725R, RD25-5 Mandatory Reliability Standards: BAL Reliability Standards

ICR 202507-1902-003 · OMB 1902-0268 · Active

Forms and Documents
DocumentTypeStatusAvailability
725R RD25-5 supporting statement.docx Supporting Statement A Uploaded 2025-07-30 Available
725R RD25-5 supporting statement.docx Supporting Statement A Uploaded 2025-07-30 Repair queued
BAL-007-1.pdf Supplementary Document Uploaded 2025-07-29 Available
BAL-007-1.pdf Supplementary Document Uploaded 2025-07-29 Repair queued
RD25-5 725R and 725A 30-day notice (Published) 7.23.25.pdf Supplementary Document Uploaded 2025-07-29 Available
RD25-5 725R and 725A 30-day notice (Published) 7.23.25.pdf Supplementary Document Uploaded 2025-07-29 Missing upstream
RD25-5 725R and 725A 30-day notice (Issued).docx Supplementary Document Uploaded 2025-07-29 Available
RD25-5 725R and 725A 30-day notice (Issued).docx Supplementary Document Uploaded 2025-07-29 Repair queued
RD25-5 725R and 725A 60-day notice (Published).pdf Supplementary Document Uploaded 2025-07-29 Available
RD25-5 725R and 725A 60-day notice (Published).pdf Supplementary Document Uploaded 2025-07-29 Repair queued
RD25-5 725R and 725A 60-day notice (Issued).docx Supplementary Document Uploaded 2025-07-29 Available
RD25-5 725R and 725A 60-day notice (Issued).docx Supplementary Document Uploaded 2025-07-29 Missing upstream
BAL-005-1.pdf Supplementary Document Uploaded 2024-01-22 Repair queued
BAL-005-1.pdf Supplementary Document Uploaded 2024-01-22 Repair queued
BAL-002-3.pdf Supplementary Document Uploaded 2024-01-22 Available
BAL-002-3.pdf Supplementary Document Uploaded 2024-01-22 Repair queued
BAL-001-2.pdf Supplementary Document Uploaded 2024-01-22 Available
BAL-001-2.pdf Supplementary Document Uploaded 2024-01-22 Missing upstream
BAL-003-2.pdf Supplementary Document Uploaded 2024-01-22 Available
BAL-003-2.pdf Supplementary Document Uploaded 2024-01-22 Repair queued
16 U.S.C. 824o.pdf Supplementary Document Uploaded 2020-12-29 Available
16 U.S.C. 824o.pdf Supplementary Document Uploaded 2020-12-29 Repair queued
18 CFR Part 40.pdf Supplementary Document Uploaded 2020-12-29 Available
18 CFR Part 40.pdf Supplementary Document Uploaded 2020-12-29 Repair queued
ICR Details
1902-0268 202507-1902-003
Active 202401-1902-001
FERC FERC-725R
FERC-725R, RD25-5 Mandatory Reliability Standards: BAL Reliability Standards
Revision of a currently approved collection   No
Regular
Approved without change 11/20/2025
Retrieve Notice of Action (NOA) 07/30/2025
Because the agency sought comments only on the changes associated with the regulation, the existing expiration date remains the same for this collection. In accordance with 5 CFR 1320, the information collection is approved.
  Inventory as of this Action Requested Previously Approved
06/30/2027 36 Months From Approved 06/30/2027
3,572 0 3,475
27,346 0 25,018
0 0 0

The FERC 725R consists of BAL standards. These standards pertain to resource and demand balancing (BAL) body of standards and detail the role of entities to ensure proper load, generation, and interchange balancing. At present, FERC-725R consists of a collection of information associated with the following nationwide Reliability Standards: • BAL-001-2, Real Power Balancing Control Performance; • BAL-002-3, Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event; and • BAL-003-2, Frequency Response and Frequency Bias Setting; and • BAL-005-1, Balancing Authority Control. • BAL-007-1, Near-term Energy Reliability Assessments (ERA)

US Code: 16 USC 824o Name of Law: EPAct 2005
  
None

Not associated with rulemaking

  90 FR 15460 04/11/2025
90 FR 34654 07/23/2025
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 3,572 3,475 0 97 0 0
Annual Time Burden (Hours) 27,346 25,018 0 2,328 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Changing Regulations
No
The information collection contained in FERC 725R is adding a new reliability standard, BAL-007-1, Near-Term ERA. Burden has been added to reflect the 97 annual responses and 2,328 hours. The were no changes made to the remaining Reliability standards that fall under FERC-725R.

$7,978
No
    No
    No
No
No
No
No
David O'Conner 202 502-6695

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/30/2025