Information Collection Request

NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal)

ICR 202506-2060-006 · OMB 2060-0059 · Active

Forms and Documents
DocumentTypeStatusAvailability
1156.16 Supplemental Regulatory Text.docx Supplementary Document Uploaded 2025-06-25 Available
1156.16 Supplemental Regulatory Text.docx Supplementary Document Uploaded 2025-06-25 Missing upstream
1156t16.xlsx Supplementary Document Uploaded 2025-06-25 Available
1156t16.xlsx Supplementary Document Uploaded 2025-06-25 Missing upstream
1156ss16.docx Supporting Statement A Uploaded 2025-06-25 Available
1156ss16.docx Supporting Statement A Uploaded 2025-06-25 Available
IC Document Collections
IC IDCollectionTypeStatusForm
44021 NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal) Other-Screenshots Modified
ICR Details
2060-0059 202506-2060-006
Active 202203-2060-013
EPA/OAR 1156.16
NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/12/2025
Retrieve Notice of Action (NOA) 06/30/2025
In accordance with 5 CFR 1320, this information collection is approved.
  Inventory as of this Action Requested Previously Approved
12/31/2028 36 Months From Approved 12/31/2025
55 0 55
1,880 0 1,880
252,000 0 165,000

The New Source Performance Standards (NSPS) for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) were proposed on November 23, 1982, promulgated on April 5, 1984, and amended on October 17, 2000. These regulations apply to both existing and new synthetic fiber production plants with a solvent-spun, synthetic fiber process that produce more than 500 megagrams (Mgs) of fiber per year that commenced construction or reconstruction after the date of proposal. The provisions of this subpart do not apply to any facility that uses the reaction spinning process to produce spandex fiber, or the viscose process to produce rayon fiber, or to facilities that commence modification, but not reconstruction, after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart HHH. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  89 FR 63933 08/06/2024
90 FR 26286 06/20/2025
No

1
IC Title Form No. Form Name
NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 55 55 0 0 0 0
Annual Time Burden (Hours) 1,880 1,880 0 0 0 0
Annual Cost Burden (Dollars) 252,000 165,000 0 0 87,000 0
No
No

$7,040
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/30/2025