10 CFR Part 53, Risk-Informed, Technology-Inclusive Regulatory Framework for Commercial Nuclear Plants
New collection (Request for a new OMB Control Number)
No
Regular
10/31/2024
Requested
Previously Approved
36 Months From Approved
11
0
220,801
0
951
0
PROPOSED RULE: Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors
The NRC is proposing to establish an optional technology-inclusive regulatory framework for use by applicants for new commercial nuclear plant designs. The regulatory requirements developed in this rulemaking would use methods of evaluation, including risk-informed and performance-based methods, that are flexible and practicable for application to a variety of new reactor technologies. The NRCâs goals in amending these regulations are to continue to provide reasonable assurance of adequate protection of public health and safety and the common defense and security at reactor sites at which new nuclear reactor designs are deployed to at least the same degree of protection as required for current-generation LWRs; protect health and minimize danger to life or property to at least the same degree of protection as required for current-generation LWRs; provide greater operational flexibilities where supported by enhanced margins of safety that may be provided in new nuclear designs; and promote regulatory stability, predictability, and clarity.
The proposed rule covers diverse topics, which result in recordkeeping and reporting requirements related to contents of applications, plant design and analysis, siting, construction and manufacturing, licensing-basis information, facility operations, programs, staffing, FFD, physical security, cyber-security, AA, decommissioning, and quality assurance.
The information collections associated with the proposed rule have been submitted under the following clearance numbers:
3150-XXXX Burden for 10 CFR Part 26 (temporary clearance number, 3150-0146 is currently unavailable for submissions due to the renewal)
3150-XXXX Burden for 10 CFR Part 50 (temporary clearance number, 3150-0011 is currently unavailable for submissions due to the renewal)
3150-XXXX Burden for 10 CFR Part 53 (new clearance number for a new CFR Part)
3150-XXXX NRC Forms 893 and 894 (new clearance number for a new form)
3150-0002: 10 CFR Part 73 (revision)
3150-0104: NRC Form 366 (revision)
3150-0238: NRC Form 361 (revision)
The proposed rule would impose new information collections and thus would not change an existing OMB approved information collection. The information collected is essential to permit NRC to evaluate applications and issue licenses under Part 53, as well as effectively exercise its oversight functions and monitor licensee compliance with Part 53 regulations.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.