Cranes and Derricks in Construction Standard (29 CFR part 1926, Subpart CC) RR
Extension without change of a currently approved collection
No
Regular
07/09/2024
Requested
Previously Approved
36 Months From Approved
07/31/2024
3,013,542
3,009,167
429,483
429,478
2,811,282
2,547,063
The collection of information contained in the Cranes and Derricks Standard codified at 29 CFR part 1926 subpart CC mandate that a covered employer produce and maintain records documenting controls and other measures taken to protect workers from hazards related to cranes and derricks used in construction. A construction business with workers who operate or work in the vicinity of cranes and derricks must have, as applicable, the following documents on file and available at the job site: equipment ratings, employee training records, written authorizations from qualified individuals, operatorâs certification documents and qualification program audits.
In addition, the standard for cranes and derricks in construction provides specific exemptions and clarifications with regard to the application of the standard to cranes and derricks used for railway roadway work. These exemptions and clarifications recognize the unique equipment and circumstances in railway roadway work and reflect the preemption of some OSHA requirements by regulations promulgated by the Federal Railroad Administration.
US Code:
29 USC 651
Name of Law: Occupational Safety and Health Act
US Code:
29 USC 655
Name of Law: Occupational Safety and Health Act
US Code:
29 USC 657
Name of Law: Occupational Safety and Health Act
The agency is requesting a slight burden hour adjustment increase from 429,478 to 429,483. The results are increased from rounding in totals in the spreadsheets.
Also, the agency is requesting an adjustment cost increase of $264,218 from $2,547,063.43 to $2,811,282. The agency uses wage rates to estimate capital costs. As a result of an increase in capital costs due to the increase to the wages.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.