Information Collection Request

FERC-516, Electric Rate Schedules and Tariff Filings (Final Rule RM22-14)

ICR 202307-1902-003 · OMB 1902-0096 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
RM22-14 News Release.pdf Supplementary Document Uploaded 2023-09-07 Repair queued
Final_RM22-14 (Final Rule) Supporting Statement- Combined 516 and 516A.docx Supporting Statement A Uploaded 2023-09-06 Missing upstream
Fact Sheet _ RM22-14.pdf Supplementary Document Uploaded 2023-08-02 Missing upstream
Staff Presentation_RM22-14.pdf Supplementary Document Uploaded 2023-08-02 Repair queued
18 CFR Part 38.docx Supplementary Document Uploaded 2021-07-07 Repair queued
18 CFR Part 35.docx Supplementary Document Uploaded 2021-07-07 Missing upstream
Pub.L 109-59 1211, Title XII, Subtitle A Energy Policy Act of 2005.pdf Supplementary Document Uploaded 2021-07-07 Repair queued
Federal Power Act.docx Supplementary Document Uploaded 2021-07-07 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
261423 Interconnection Reform_RM22-14_Reasonable Efforts Standard (Ongoing) New
261422 Interconnection Reforms_RM22-14_First Ready First Served (Ongoing) New
261418 Interconnection Reforms_RM22-14_Interconnection Info. Access (Ongoing) New
261408 Updates to Interconnection Procedures and Agreements per Final Rule RM22-14 (One-Time) New
254288 Requiring Public Utilities with Transmission Formula Rates to Incorporate a New Permanent Worksheet That Will Annually Track ADIT Information, RM19-5 (Year One Filing) Removed
254102 Annual Update of ADIT Worksheet, RM19-5 (Ongoing Filing) Unchanged
254101 Reform of Generator Interconnection Procedures and Agreements, RM17-8, RTO/ISO (Ongoing Filing) Unchanged
254100 Reform of Generator Interconnection Procedures and Agreements, RM17-8, Non-RTO/ISO (Ongoing Filing) Unchanged
254099 Demand Response, RM10-17 (Ongoing Filing) Unchanged
254096 Demand Response, RM10-17 (Year One Filing) Removed
254091 Revision of Transmission Formula Rates By Amortizing ADITs, RM19-5 (Year One Filing) Removed
254089 Revision of Rate Base of Transmission Formula Rates Affected by Accumulated Deferred Income Taxes (ADITs), RM19-5 (Year One Filing) Removed
254078 Standards for Business Practices and Communication Protocols for Public Utilities Tariff Filings, RM05-5-022 (Year One Filing) Removed
231408 Reform of Generator Interconnection Procedures and Agreements, RM17-8 (Year One Filing) Removed
23073 Electric Rate Schedules and Tariff Filings (Ongoing Filing) Unchanged
230207 Essential Reliability Services and the Evolving Bulk-Power System -- Primary Frequency Response, RM16-6 (Ongoing Filing) Unchanged
219045 Tariff Filing to Reflect Primary Frequency Response Services in MBR, RM15-2 (Year One Filing) Removed
206027 Tariff Filings, RM05-5-020 (Year One Filing) Removed
203116 Variable Energy Resource Integration Rule, RM10-11 (Ongoing Filing, Mandatory) Unchanged
203115 Variable Energy Resource Integration Rule, RM10-11 (Ongoing Filing, Voluntary) Unchanged
199916 Frequency Regulation, RM11-7 (Year One Filing) Removed
ICR Details
1902-0096 202307-1902-003
Received in OIRA 202107-1902-001
FERC FERC-516
FERC-516, Electric Rate Schedules and Tariff Filings (Final Rule RM22-14)
Revision of a currently approved collection   No
Regular 09/07/2023
  Requested Previously Approved
36 Months From Approved 06/30/2025
7,504 6,768
554,069 542,919
0 0

Section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, obligates the Commission to remedy unjust, unreasonable, and unduly discriminatory or preferential rates, terms, and conditions of transmission service. Generator interconnection is a critical component of open access transmission service. This information collection request for FERC 516 involves Commission implementation of FPA section 206 via: • 18 CFR 35.28 (“Non-Discriminatory Open Access Transmission Tariff”); • The pro forma Large Generator Interconnection Procedures (LGIP); • The pro forma Large Generator Interconnection Agreement (LGIA); The Commission’s regulations at 18 CFR 35.28 (2022) require certain types of entities to have on file an Open Access Transmission Tariff (OATT) that contains minimum terms and conditions of non-discriminatory transmission service. This requirement applies to all public utilities that own, control, or operate facilities used for transmitting electric energy in interstate commerce. Public utilities that are required to have an OATT on file with the Commission must include the pro forma LGIP, pro forma LGIA, pro forma SGIP, and pro forma SGIA in their OATT. Other provisions in section 35.28 apply to non-public utilities, but only if they seek voluntary compliance with jurisdictional transmission tariff reciprocity conditions. Non-public utilities are not affected by this information collection request.

PL: Pub.L. 109 - 58 1241 Name of Law: Energy Policy Act of 2005
   US Code: 16 USC 205(c) (d), 206, 219(a) (b) Name of Law: Federal Power Act
  
None

1902-AG00 Final or interim final rulemaking 88 FR 61014 09/06/2023

No

12
IC Title Form No. Form Name
Annual Update of ADIT Worksheet, RM19-5 (Ongoing Filing)
Demand Response, RM10-17 (Ongoing Filing)
Demand Response, RM10-17 (Year One Filing)
Electric Rate Schedules and Tariff Filings (Ongoing Filing)
Essential Reliability Services and the Evolving Bulk-Power System -- Primary Frequency Response, RM16-6 (Ongoing Filing)
Frequency Regulation, RM11-7 (Year One Filing)
Interconnection Reform_RM22-14_Reasonable Efforts Standard (Ongoing)
Interconnection Reforms_RM22-14_First Ready First Served (Ongoing)
Interconnection Reforms_RM22-14_Interconnection Info. Access (Ongoing)
Reform of Generator Interconnection Procedures and Agreements, RM17-8 (Year One Filing)
Reform of Generator Interconnection Procedures and Agreements, RM17-8, Non-RTO/ISO (Ongoing Filing)
Reform of Generator Interconnection Procedures and Agreements, RM17-8, RTO/ISO (Ongoing Filing)
Requiring Public Utilities with Transmission Formula Rates to Incorporate a New Permanent Worksheet That Will Annually Track ADIT Information, RM19-5 (Year One Filing)
Revision of Rate Base of Transmission Formula Rates Affected by Accumulated Deferred Income Taxes (ADITs), RM19-5 (Year One Filing)
Revision of Transmission Formula Rates By Amortizing ADITs, RM19-5 (Year One Filing)
Standards for Business Practices and Communication Protocols for Public Utilities Tariff Filings, RM05-5-022 (Year One Filing)
Tariff Filing to Reflect Primary Frequency Response Services in MBR, RM15-2 (Year One Filing)
Tariff Filings, RM05-5-020 (Year One Filing)
Updates to Interconnection Procedures and Agreements per Final Rule RM22-14 (One-Time)
Variable Energy Resource Integration Rule, RM10-11 (Ongoing Filing, Mandatory)
Variable Energy Resource Integration Rule, RM10-11 (Ongoing Filing, Voluntary)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 7,504 6,768 0 736 0 0
Annual Time Burden (Hours) 554,069 542,919 0 11,150 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Changing Regulations
Yes
Changing Regulations
The PRA activities in the final rule would increase the total burden of FERC-516. Prior to this final rule, there were 17 total information collections (ICs) within the FERC 516. Out of those 17 ICs, 8 of those were one-time costs associated with previous rulemkaings, those are now being removed since they are no longer in effect. Furthermore, due to the final rule in Docket No. RM22-14-000, there are four new ICs to account for the one-time updates to respondent’s interconnection procedures and agreements and the three ongoing collections (Interconnection Information Access, First Ready-First Served, and Reasonable Efforts Standard).

$7,186,730
No
    No
    No
No
No
No
No
Alyssa Meyer 202 502-6835 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/07/2023