Upon renewal of this collection, OMB requests that EPA submit the following as supplemental documents: the regulatory text that includes the ICR; the regulatory text that includes the submission instructions; and any screen shots of the electronic portal where the reporting requirements are submitted online to EPA. Please discuss in more detail how each piece of information is submitted, either electronically or in hard copy, and what information is permitted to be submitted in electronic format. Please include the OMB burden statement on the electronic portal. Finally, please also update to the standard 18 question SS-A format upon renewal.
Inventory as of this Action
Requested
Previously Approved
12/31/2024
36 Months From Approved
12/31/2021
207
0
177
16,400
0
14,200
826,000
0
700,000
The New Source Performance Standards (NSPS) for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) apply to each existing and new coating operation and any on-site coating mix preparation equipment used to prepare coatings for the polymeric coating of supporting substrates. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart VVV.
There is an increase in burden from the most-recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to an increase in the number of respondents subject to the rule. An examination of EPAs Enforcement and Compliance History Online (ECHO) database indicated that there are 72 sources currently reporting under NSPS Subpart VVV, an increase of 10 sources from the previous ICR. The regulations have not changed over the past three years and are not anticipated to change over the next three years. The increase in the operation and maintenance (O&M) costs is due to the increase in the number of respondents performing monitoring activities. The rate of increase in the number of new respondents remains steady at one new source per year, so the capital/startup cost will not increase.
$46,100
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.