Information Collection Request

NSPS for Portland Cement Plants (40 CFR part 60, subpart F) (Renewal)

ICR 202107-2060-003 · OMB 2060-0025 · Active

Forms and Documents
DocumentTypeStatusAvailability
1051t15calcs.xlsx Supplementary Document Uploaded 2021-07-01 Available
1051t15calcs.xlsx Supplementary Document Uploaded 2021-07-01 Repair queued
1051ss15.docx Supporting Statement A Uploaded 2021-07-01 Available
1051ss15.docx Supporting Statement A Uploaded 2021-07-01 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
24050 NSPS for Portland Cement Plants (40 CFR part 60, subpart F) Modified
ICR Details
2060-0025 202107-2060-003
Active 201807-2060-005
EPA/OAR 1051.15
NSPS for Portland Cement Plants (40 CFR part 60, subpart F) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/08/2021
Retrieve Notice of Action (NOA) 07/01/2021
Upon renewal of this collection, OMB requests that EPA submit the following as supplemental documents: the regulatory text that includes the ICR; the regulatory text that includes the submission instructions; and any screen shots of the electronic portal where the reporting requirements are submitted online to EPA. Please discuss in more detail how the information is submitted, either electronically or in hard copy, and what information is permitted to be submitted in electronic format. Please include the OMB burden statement on the electronic portal. Finally, please also update to the standard 18 question SS-A format upon renewal.
  Inventory as of this Action Requested Previously Approved
12/31/2024 36 Months From Approved 12/31/2021
198 0 204
14,100 0 14,500
744,000 0 767,000

Owners and operators of facilities subject to New Source Performance Standards (NSPS) for Portland Cement Plants are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as the specific requirements at 40 CFR Part 60, Subpart F. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards.

US Code: 42 USC 7601 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  85 FR 28003 05/12/2020
86 FR 35086 07/01/2021
No

1
IC Title Form No. Form Name
NSPS for Portland Cement Plants (40 CFR part 60, subpart F)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 198 204 0 0 -6 0
Annual Time Burden (Hours) 14,100 14,500 0 0 -400 0
Annual Cost Burden (Dollars) 744,000 767,000 0 0 -23,000 0
No
No
There is an adjustment decrease in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. This decrease is not due to any program changes. The decrease in burden from the most-recently approved ICR is due to a decrease in the number of affected existing facilities, as identified by a review of Portland cement facilities reporting in EPAs ECHO and GHGRP databases. This change also results in a decrease in operation and maintenance costs. This ICR maintains an assumption that there will be no new respondents over the next three years, but two existing plants will undergo modification or reconstruction. Therefore, the capital costs have not changed from the previous ICR.

$44,100
No
    No
    No
No
No
No
No
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/01/2021