Upon renewal of this collection, OMB requests that EPA submit the following as supplemental documents: the regulatory text that includes the ICR; the regulatory text that includes the submission instructions; and any screen shots of the electronic portal where the reporting requirements are submitted online to EPA. Please discuss in more detail how the information is submitted, either electronically or in hard copy, and what information is permitted to be submitted in electronic format. Please include the OMB burden statement on the electronic portal. Finally, please also update to the standard 18 question SS-A format upon renewal.
Inventory as of this Action
Requested
Previously Approved
12/31/2024
36 Months From Approved
12/31/2021
198
0
204
14,100
0
14,500
744,000
0
767,000
Owners and operators of facilities subject to New Source Performance Standards (NSPS) for Portland Cement Plants are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as the specific requirements at 40 CFR Part 60, Subpart F. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards.
There is an adjustment decrease in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. This decrease is not due to any program changes. The decrease in burden from the most-recently approved ICR is due to a decrease in the number of affected existing facilities, as identified by a review of Portland cement facilities reporting in EPAs ECHO and GHGRP databases. This change also results in a decrease in operation and maintenance costs. This ICR maintains an assumption that there will be no new respondents over the next three years, but two existing plants will undergo modification or reconstruction. Therefore, the capital costs have not changed from the previous ICR.
$44,100
No
No
No
No
No
No
No
Patrick Yellin 202 564-2970
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.