Information Collection Request

Drawbridge Operation Regulations

ICR 202102-1625-007 · OMB 1625-0109 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
1625-0109 30-day FR Notice 86FR2427 20210112.docx Supplementary Document Uploaded 2021-02-24 Repair queued
1625-0109 60-day FR Notice 85 FR 66572 20201020.docx Supplementary Document Uploaded 2021-02-24 Repair queued
PTA, USCG - Drawbridge Operations, 20171006, PRIV final.pdf Supplementary Document Uploaded 2018-02-26 Repair queued
CFR-2010-title33-vol1-part117.pdf Supplementary Document Uploaded 2018-02-26 Repair queued
USCODE-2011-title5-partI-chap5-subchapII-sec553.pdf Supplementary Document Uploaded 2018-02-26 Repair queued
USCODE-2011-title33-chap11-subchapI-sec499.pdf Supplementary Document Uploaded 2018-02-26 Missing upstream
1625-0109 Supporting Statement DHS Correction (003) (002) (002).docx Supporting Statement A Uploaded 2021-03-26 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
20661 Drawbridge Operation Regulations Instruction Modified
ICR Details
1625-0109 202102-1625-007
Received in OIRA 201802-1625-002
DHS/USCG
Drawbridge Operation Regulations
Extension without change of a currently approved collection   No
Regular 03/26/2021
  Requested Previously Approved
36 Months From Approved 03/31/2021
412 150
412 150
0 0

The U.S. Coast Guard, Office of Bridge Administration requires information from the bridge owners detailing any requested change to the operating requirements of drawbridges so that they can evaluate the impact to navigation and provide notice to the public.

US Code: 5 USC 553 Name of Law: Rule making
   US Code: 33 USC 499 Name of Law: Regulations for Drawbridges
  
None

Not associated with rulemaking

  85 FR 66572 10/20/2020
86 FR 2427 01/12/2021
No

1
IC Title Form No. Form Name
Drawbridge Operation Regulations

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 412 150 0 0 262 0
Annual Time Burden (Hours) 412 150 0 0 262 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
The USCG received 262 additional requests. It takes the bridge owner approximately one hour to generate a request to the Coast Guard to change the operating schedule of a bridge. The estimated burden is based on the length of time necessary to prepare an email/letter with the information required for the requested change and its submittal to the District Bridge Administrator. The reporting and recordkeeping requirements and the methodology for calculating burden remain unchanged.

$96,041
No
    No
    No
No
No
No
No
Josef Jaufmann 202 372-1512 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/26/2021