Information Collection Request

NSPS for Electric Utility Steam Generating Units (40 CFR part 60, subpart Da) (Renewal)

ICR 202012-2060-011 · OMB 2060-0023 · Active

Forms and Documents
DocumentTypeStatusAvailability
1053t13.xlsx Supplementary Document Uploaded 2020-12-15 Available
1053t13.xlsx Supplementary Document Uploaded 2020-12-15 Repair queued
1053ss13.docx Supporting Statement A Uploaded 2020-12-15 Available
1053ss13.docx Supporting Statement A Uploaded 2020-12-15 Repair queued
IC Document Collections
ICR Details
2060-0023 202012-2060-011
Active 201712-2060-004
EPA/OAR 1053.13
NSPS for Electric Utility Steam Generating Units (40 CFR part 60, subpart Da) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/07/2021
Retrieve Notice of Action (NOA) 01/11/2021
Upon renewal of this collection, OMB requests that EPA submit the following as supplemental documents: the regulatory text that includes the ICR; the regulatory text that includes the submission instructions; and any screen shots of the electronic portal where the reporting requirements are submitted online to EPA. Please discuss in more detail how the information is submitted, either electronically or in hard copy, and what information is permitted to be submitted in electronic format. The agency should include evidence of consultation with respondents (by actively reaching out to stakeholders as permitted by the PRA) to ensure the supporting statement's accuracy on accuracy of burden estimate. Finally, please also update to the standard 18 question SS-A format upon renewal.
  Inventory as of this Action Requested Previously Approved
12/31/2024 36 Months From Approved 12/31/2021
1,756 0 1,802
171,000 0 177,000
11,000,000 0 13,300,000

Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as the specific requirements at 40 CFR Part 60, Subpart Da. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards.

US Code: 44 USC 3501 et.seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  85 FR 28003 05/12/2020
86 FR 1963 01/11/2021
No

1
IC Title Form No. Form Name
NSPS for Electric Utility Steam Generating Units (40 CFR Part 60, subpart Da)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1,756 1,802 0 0 -46 0
Annual Time Burden (Hours) 171,000 177,000 0 0 -6,000 0
Annual Cost Burden (Dollars) 11,000,000 13,300,000 0 0 -2,300,000 0
No
No
There is a decrease in burden from the most-recently approved ICR due to an adjustment. This decrease is not due to any program changes. The decrease in burden reflects a slight decrease in the number of respondents from the currently active ICR. Based on consultations with agency experts, we expect no new coal-fired boilers under subpart Da and the discontinued use of some existing coal-fired units within the industry, thus reducing the number of respondents required to conduct recordkeeping and reporting. This results in a reduction in labor burden and eliminates costs associated with initial notifications and capital/startup costs.

$799,000
No
    No
    No
No
No
No
No
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/11/2021