In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
05/31/2022
36 Months From Approved
05/31/2019
2
0
2
41
0
41
550
0
550
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Semiconductor Manufacturing (40 CFR Part 63, Subpart BBBBB) were proposed on May 8, 2002, and promulgated on May 22, 2003. These regulations apply to existing facilities and new facilities that emits or has the potential to emit, considering controls, in the aggregate, any single hazardous air pollutants (HAP) at a rate of 10 tons per year (tpy) or more or any combination of HAP at a rate of 25 tpy or more. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart BBBBB.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.