In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
04/30/2022
36 Months From Approved
04/30/2019
245
0
209
22,200
0
18,900
34,500
0
29,500
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Integrated Iron and Steel Manufacturing Facilities (40 CFR Part 63, Subpart FFFFF) apply to new and existing sinter plants, blast furnaces, and basic oxygen process furnace shops at integrated iron and steel manufacturing facilities that are major sources of hazardous air pollutants (HAPs) or are co-located at major sources. New facilities include those that commenced either construction or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. This information is being collected to assure compliance with 40 CFR Part 63, Subpart FFFFF.
There is an increase in the total estimated respondent burden compared with the ICR currently approved by OMB. The increase in burden is not due to any program changes, but is due to an adjustment. The adjustment increase in burden from the most- recently approved ICR is due to an increase in the number of new or modified sources due to continued industry growth. In addition, the burden estimate for reading and understanding the rule requirements was adjusted to reflect the time it would take existing respondents to review the rule each year. The overall result is an increase in burden and costs.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.