In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
03/31/2022
36 Months From Approved
03/31/2019
5,438
0
5,239
20,200
0
14,120
228,000
0
228,000
The New Source Performance Standards (NSPS) for Nonmetallic Mineral Processing (40 CFR Part 60, Subpart OOO) apply to the following affected facilities in fixed or portable nonmetallic mineral processing plants: each crusher, grinding mill, screening operation, bucket elevator, belt conveyor, bagging operation, storage bin, and enclosed truck or railcar loading station, which commenced construction, modification or reconstruction after August 31, 1983. Also, crushers and grinding mills at hot mix asphalt facilities that reduce the size of nonmetallic minerals embedded in recycled asphalt pavement and subsequent affected facilities up to, but not including, the first storage silo or bin are subject to the provisions of the subpart. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart OOO.
The increase in burden for respondents from the most recently approved ICR is due to two adjustments. The first adjustment increase in burden is an increase in the number of new or modified sources. The second adjustment increase in burden from the most recently approved ICR is the addition of burden hours to account for the time spent by existing facilities to re-familiarize themselves annually with the rule requirements.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.