The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart DDDDDDD.
Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required annually.
There is an adjustment increase in the respondent labor hours and cost in this ICR compared to the previous ICR. This is not due to program changes. The increase occurred because this ICR assumes all existing respondents will take some time each year to re-familiarize with the regulatory requirements. Additionally, there is a small decrease of $36 in the estimated O&M cost due to rounding. This ICR rounds all calculated burden and costs to three significant digits. There is no change in the methodology or assumption used to calculate O&M cost.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.