The affected entities are subject to the General Provisions of the NESHAP (40 CFR Part 63, Subpart A), and any changes, or additions to the General Provisions, which are specified at 40 CFR Part 63, Subpart HHHHHHH. Owners or operators of the affected facilities must submit an initial notification report, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.
There is an adjustment increase in the estimated burden as currently identified in the OMB Inventory of Approved Burdens. In consulting with the Vinyl Institute during the renewal of this ICR, EPA received comprehensive comments on the burden associated with specific reporting and recordkeeping requirements, including, but not limited to, performance test, monitor installation, resin and wastewater sampling, equipment leak and process vent monitoring. We have updated the burden items to more accurately reflect the costs incurred by the industry. The update results in a substantial increase in the respondent labor hours, labor costs, and capital/O&M costs. There is also an increase in the number of responses as we have updated the number of subject major sources from 15 to 17 based on data provided by the Vinyl Institute.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.