In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
12/31/2018
36 Months From Approved
11/30/2015
45
0
44
2,306
0
2,306
13,000
0
13,000
This NSPS affects owners and operators of metallic mineral processing plants. Owners and operators must conduct initial performance tests, maintain records of startups, shutdowns, and malfunction and continuous monitoring system parameters, and submit semi-annual reports. The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures, and for compliance determinations. This information is collected to assure compliance with 40 CFR Part 60, Subpart LL.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.