In accordance with 5 CFR 1320, the information collection is approved for three years.
In future collections, costs and time burden estimates should be rounded to the appropriate
number of significant digits. If "reading instructions" are provided as potential time or cost
burdens, then the location of the instructions or the instructions themselves should be
provided. Also, the burden for refreshing on instructions should be included, as appropriate.
Any detailed tables should be provided in excel format along with or in lieu of detailed tables provided within the supporting statement.
Inventory as of this Action
Requested
Previously Approved
04/30/2018
36 Months From Approved
04/30/2015
300
0
300
33,912
0
33,912
5,240,000
0
5,240,000
Owners and operators must notify EPA of construction modification startups, shutdowns, malfunctions, and data and results of performance test. Owners/operators must continually monitor and record temperature in specified pollution control devices. EPA determines parameters to be recorded in other control devices upon description of that device by the source.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.