Information Collection Request

30 CFR Part 250, Subpart S, Safety and Environmental Management Systems for Outer Continental Shelf Oil, Gas, and Sulphur Operations

ICR 201404-1014-003 · OMB 1014-0017 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
1014-0017 -Justification for Non substantive change 4-4-14.docx Justification for No Material/Nonsubstantive Change Uploaded 2014-04-08 Available
AA04_FR_ss-11-6-12.docx Supporting Statement A Uploaded 2012-11-13 Available
eCFR for S as of 6-15-12.docx Supplementary Document Uploaded 2012-06-19 Repair queued
AD73 Proposed Rule Published 9-14-2011.pdf Supplementary Document Uploaded 2012-06-19 Available
IC Document Collections
IC IDCollectionTypeStatusForm
202776 250.1920(a), (b) 1921; Lead ASP audit cost for high, moderate and low operator Modified
202735 250.1922 Available upon request to BSEE; conflict of interest procedures Unchanged
202732 250.1922 Request approval for AB; submits documentation re accreditation of ASP Unchanged
202730 250.1933(c) Post unsafe reporting practices for all to see Unchanged
202728 250.1930(c) Document decision to resume SWA Unchanged
194773 30 CFR 250.1924(b) - Make available to BSEE evaulation documentation and supporting information Unchanged
194772 30 CFR 250.1920(d); 1925(b) - Submit copy of audit plan including correction schedule etc. Unchanged
192993 30 CFR 250.1920(c); 1925 - Submit audit report with findings/conclusions/deficiencies Unchanged
192876 30 CFR 250.1911(b) - Immediate supervisor conducts, signs and ensure everyone involved signs the JSA. Unchanged
192875 30 CFR 250.1928 - Documentation and recordkeeping Unchanged
192874 30 CFR 250.1925(a); - pay for all costs associated with your BSEE directed audit Modified
186875 30 CFR 250.1928(d), (e); 1929 - Form BSEE-0131; maintain contractor employee injury/illness log retain for 2 yrs, make available to BSEE; inform re hazards; Instruction Unchanged
186874 30 CFR 250.1920 - notify BSEE with audit schedule 30 days in advance Unchanged
186872 30 CFR 250.1924(c) - Demonstrate and explain if req'd, SEMS; produce documentation Unchanged
186871 30 CFR 250.1900-1933 - Low Activity Operator-maintain Unchanged
186870 30 CFR 250.1900-1933 - Moderate Activity Operator-maintain Unchanged
186869 30 CFR 250.1900-1933 - High Activity Operator-maintain Unchanged
ICR Details
1014-0017 201404-1014-003
Historical Active 201306-1014-001
DOI/BSEE 1014-0017 SEMS II
30 CFR Part 250, Subpart S, Safety and Environmental Management Systems for Outer Continental Shelf Oil, Gas, and Sulphur Operations
No material or nonsubstantive change to a currently approved collection   No
Regular
Approved without change 04/11/2014
Retrieve Notice of Action (NOA) 04/08/2014
  Inventory as of this Action Requested Previously Approved
03/31/2016 03/31/2016 03/31/2016
292,415 0 292,415
651,728 0 651,728
9,444,000 0 1,250,000

Subpart S requirements require the operator (et al) to integrate a comprehensive SEMS program into the management of their OCS operations, providing for the prevention of waste and conservation of natural resources on the OCS. These regulations hold the operator accountable for the overall safety of the offshore facility; ensuring all contractors and subcontractors have safety policies/procedures in place that support the implementation of the operator's SEMS program and align with the principles of managing safety as in API RP 75 as well as other specific standards.

US Code: 43 USC 1331; 1801 et seq Name of Law: OCSLA
  
None

1014-AA04 Final or interim final rulemaking 78 FR 20423 04/05/2013

Yes

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 292,415 292,415 0 0 0 0
Annual Time Burden (Hours) 651,728 651,728 0 0 0 0
Annual Cost Burden (Dollars) 9,444,000 1,250,000 0 0 8,194,000 0
No
No

$2,292,290
No
No
No
No
No
Uncollected
Cheryl Blundon 703-787-1607 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/08/2014