The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart EEEE.
Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.
There is an adjustment increase in the respondent labor hours in this ICR compared to the previous ICR. This is due to an increase in the estimated number of hours to prepare semiannual reports. The previous ICR estimated 40 technical hours per occurrence for this burden item. Based on consultation comments received during development of this ICR, we revised the estimate to 80 hours per semiannual report to more accurately reflect industry burden. In addition, there is an increase in respondent labor costs from the most recently approved ICR due to adjustments in labor rates. This ICR uses updated labor rates to calculate all burden costs.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.