Pre-approval contingent upon no substantive changes to this collection between this date and the publication of the final rule in the Federal Register. If there are substantive changes made to this collection during this interim period, NRC should submit the collection to OMB for review. Additionally, OMB requests the agency to update the Federal Register notice information in this collection once the final rule is published in the Federal Register.
Inventory as of this Action
Requested
Previously Approved
01/31/2016
36 Months From Approved
83,796
0
0
139,109
0
0
529,137
0
0
FINAL RULE "10 CFR Parts 30, 32, 33, 34, 35, 36, 37, 39, 51, 71, and 73, Physical Protection of Byproduct Material."
The NRC is amending its regulations to establish security requirements for the use and transport of category 1 and category 2 quantities of radioactive material. The NRC considers these quantities to be risk significant and, therefore, to warrant additional protection. Category 1 and category 2 thresholds are based on the quantities established by the International Atomic Energy Agency (IAEA) in its Code of Conduct on the Safety and Security of Radioactive Sources, which the NRC endorses. The objective of this final rule is to provide reasonable assurance of preventing the theft or diversion of category 1 and category 2 quantities of radioactive material. The regulations also include security requirements for the transportation of irradiated reactor fuel that weighs 100 grams or less in net weight of irradiated fuel.
The final rule would require licensees to: (1) develop procedures for implementation of the security provisions; (2) develop a security plan that describes how security is being implemented; (3) conduct training on the procedures and security plan; (4) conduct background investigations for those individuals permitted access to category 1 or category 2 quantities of radioactive material; (5) coordinate with LLEAs so the LLEAs would be better prepared to respond in an emergency; (6) conduct preplanning and coordination activities before shipping radioactive material; and (7) implement security measures for the protection of the radioactive material. Licensees would be required to promptly report any attempted or actual theft or diversion of the radioactive material. Licensees would be required to keep copies of the security plan, procedures, background investigation records, training records, and documentation that certain activities have occurred.
The final rule would impose a new information collection and thus would not change an existing OMB approved information collection. The information collected is essential to permit NRC to make a determination as to the adequacy of the licensee's planned system in meeting regulatory requirements. Information describing the normal operation of the physical protection system is needed to permit NRC to make a determination as to reasonable assurance that the physical protection system operates in accordance with the regulatory requirements. Information collections contacting the NRC of the occurrence and circumstances concerning abnormal events (e.g., report of theft, sabotage, or overdue shipment). This information enables the NRC to fulfill its responsibilities to respond to, investigate, and correct situations which adversely affect public health and safety or the common defense and security. The NRC recognized the potential risk from insiders (persons having unescorted access to radioactive material), because a deliberate malevolent act by such an individual has the potential to result in significant adverse impacts. Accordingly, the final rule requires background investigations, including the collection of fingerprints and criminal history records check.
Note that although revisions have been made to Parts 20, 30, 32, 33, 34, 35, 36, 39, 51, 71, and 73, there are no changes to information collections in these sections. All information collection burden is contained in 10 CFR 37, a new Part of the Code of Federal Regulations.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.