In accordance with 5 CFR 1320, OMB is withholding approval at this time. Prior to publication of the final rule, the agency must submit to OMB a summary of all comments related to the information collection contained in the proposed rule and the agency response. The agency should clearly indicate any changes made to the information collection as a result of these comments.
Inventory as of this Action
Requested
Previously Approved
05/31/2011
05/31/2011
05/31/2011
250
0
250
75,000
0
75,000
0
0
0
In accordance with the authority granted it in section 215 of the Federal Power Act, FERC is proposing to approve revisions to three Reliability Standards developed by the North American Reliability Corporation (NERC). NERC has been certified by FERC as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The three Reliability Standards, designated by NERC as FAC-010-1, FAC-011-1 and FAC-014-1, set requirements for the development of system operating limits of the Bulk-Power System for use in planning and operating conditions.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.