As part of its submission, EPA should verify that the wage rates referenced in sections 6(b) and 6(c) of the supporting statement have been updated to current values and properly loaded to include overhead, consistent with current EPA and OMB guidelines.
Inventory as of this Action
Requested
Previously Approved
01/31/2011
36 Months From Approved
01/31/2008
546
0
546
159,972
0
156,610
9,446,145
0
9,446,000
Owners or operators of affected facilities must 1) make one time notifications of construction/reconstruction and start up; 2) submit reports containing information such as monitoring results and excess emission; and 3) maintain records of occurrences such as startups and shutdowns.Responses to this information collection are deemed to be mandatory, per Section 114 (a) of the Clean Air Act.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.