OMB notes that the agency improperly completed the 83-I by including labor costs for question 14 rather than nonlabor costs as is clearly required by the Instructions for Completing OMB Form 83-I. In addition, the agency's response to question 15 of the supporting statement did not adequately explain the difference between this ICR and its predecessor, particularly given that the number of respondents reported on the 83-I decreased rather than increased.
Inventory as of this Action
Requested
Previously Approved
09/30/2005
09/30/2005
09/30/2002
3,300
0
5,400
11,583
0
22,788
0
0
0
FEMA Forms 81-87, 81-87A, and 81-87B are designed to assist requestors in gathering information needed to determine whether a property will flood during a flood event, that has a 1-percent annual change of being equaled or exceeded in any given year (base flood). FEMA form 81-87 describes the location of the property. FEMA Form 81-87A indicated the Base Flood Elevation (BFE) for the property and FEMA Form 81-87B, requires community officials to certify that the request complies with floodplain management
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.