In accordance with the Paperwork Reduction Act (PRA), OMB clears this information collection request for 1 year. When applying for and extention of this clearance, EPA must reexamine the need for monthly operational status checks of the control equipment as required under section 60.274(a),(c), 60.274a(a),(d). EPA must also reexamine the need for a once-per-shift record of fan motor amperage and damper position as required by 60.274(a),(b), 60.274a(b). Specifically, the agency should review how data previously collected were used in practice to determine the practical utility of these requirements.
Inventory as of this Action
Requested
Previously Approved
11/30/1988
11/30/1988
96
0
0
17,343
0
0
0
0
0
SOURCES MUST NOTIFY EPA OF CONSTRUCTION, MODIFICATION, STARTUP, SHUTDOWNS, MALFUNCTIONS, DATE AND RESULTS OF INITIAL PERFORMANCE TEST. OWNERS/OPERATORS OF AFFECTED FACILITIES SHALL INSTALL A CONTINUOUS MONITORING DEVICE TO MEASURE OPACITY, KEEP RECORDS OF FLOW RATE DATA A PRESSURE DATA, AND SUBMIT QUARTERLY OR SEMIANNUAL REPORTS OF EXCESS OPACITY, QH FAN MOTOR AMPERAGE, AND LOW FLOS RATES. EAF'S SUBJECT
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.